[Veritas-bu] whats wrong with my calendar based backup schedule. bppllist included.
2006-06-12 18:01:45
Subject: |
[Veritas-bu] whats wrong with my calendar based backup schedule. bppllist included. |
From: |
stumpb at michigan.gov (Bob Stump) |
Date: |
Mon, 12 Jun 2006 18:01:45 -0400 |
I have years of experience with frequency based scheduling but I have
always shied away from calendar based. Today I made my first attempt and
I cannot see where I made a mistake. Please review this and help me if
you can. Thanks.
Here is the problem
The calendar based backup started on the first day that I made this
policy active even though it is not suppose to be active until the last
Monday of the month.
Here is the strategy
1. full backup every monday night excluding last monday of the month
with 1 month retention
allow tuesday full for any failures that may occur on monday
3. last monday of each month run a calendar full backup with 3 month
retention
retries allowed after runday which would be tuesday night.
2. incremental backup every night except monday nights with 1 month
retention
Here is the bppllist:
Policy Name: groupwise01-09
Policy Type: Standard
Active: yes
Effective date: 06/12/2006 08:00:00
Client Compress: no
Follow NFS Mounts: no
Cross Mount Points: no
Collect TIR info: no
Block Incremental: no
Mult. Data Streams: yes
Client Encrypt: no
Checkpoint: no
Policy Priority: 25
Max Jobs/Policy: Unlimited
Disaster Recovery: 0
Residence: dssu_grp
Volume Pool: Novell
Keyword: (none specified)
HW/OS/Client: Novell NetWare gw01
Novell NetWare gw02
Novell NetWare gw03
Novell NetWare gw04
Novell NetWare gw05
Novell NetWare gw06
Novell NetWare gw07
Novell NetWare gw08
Novell NetWare gw09
Include: /FS
Schedule: 17.30_mon_calendar
Type: Full Backup
Maximum MPX: 10
Synthetic: 0
PFI Recovery: 0
Retention Level: 5 (3 months)
Number Copies: 1
Fail on Error: 0
Residence: dssu04
Volume Pool: (same as policy volume pool)
Calendar sched: Enabled
Allowed to retry after run day
SPECIFIC DATE 0 - 06/26/2006
SPECIFIC DATE 1 - 07/31/2006
SPECIFIC DATE 2 - 08/28/2006
SPECIFIC DATE 3 - 09/25/2006
SPECIFIC DATE 4 - 10/30/2006
SPECIFIC DATE 5 - 11/27/2006
SPECIFIC DATE 6 - 12/25/2006
Monday, Week 5
Daily Windows:
Monday 18:30:00 --> Tuesday 04:00:00
Tuesday 17:30:00 --> Wednesday 04:00:00
Schedule: 17.30_mon_full
Type: Full Backup
Frequency: every 5 days
Maximum MPX: 10
Synthetic: 0
PFI Recovery: 0
Retention Level: 3 (1 month)
Number Copies: 1
Fail on Error: 0
Residence: dssu04
Volume Pool: (same as policy volume pool)
EXCLUDE DATE 0 - 06/26/2006
EXCLUDE DATE 1 - 07/31/2006
EXCLUDE DATE 2 - 08/28/2006
EXCLUDE DATE 3 - 09/25/2006
EXCLUDE DATE 4 - 10/30/2006
EXCLUDE DATE 5 - 11/27/2006
EXCLUDE DATE 6 - 12/25/2006
Daily Windows:
Monday 17:20:00 --> Tuesday 04:00:00
Tuesday 17:30:00 --> Wednesday 04:00:00
Schedule: 17.30_mon_inc
Type: Differential Incremental Backup
Frequency: every 12 hours
Maximum MPX: 10
Synthetic: 0
PFI Recovery: 0
Retention Level: 3 (1 month)
Number Copies: 1
Fail on Error: 0
Residence: (specific storage unit not required)
Volume Pool: (same as policy volume pool)
Daily Windows:
Sunday 17:30:00 --> Monday 04:00:00
Tuesday 17:30:00 --> Wednesday 04:00:00
Wednesday 17:30:00 --> Thursday 04:00:00
Thursday 17:30:00 --> Friday 04:00:00
Friday 17:30:00 --> Saturday 04:00:00
Saturday 17:30:00 --> Sunday 04:00:00
-------------- next part --------------
An HTML attachment was scrubbed...
URL:
http://mailman.eng.auburn.edu/pipermail/veritas-bu/attachments/20060612/d2015084/attachment.html
|
<Prev in Thread] |
Current Thread |
[Next in Thread>
|
- [Veritas-bu] whats wrong with my calendar based backup schedule. bppllist included.,
Bob Stump <=
|
|
|