Veritas-bu

[Veritas-bu] dssu's and volume pool following...

2006-05-25 10:25:41
Subject: [Veritas-bu] dssu's and volume pool following...
From: pcd at xinupro.com (Peter DrakeUnderkoffler)
Date: Thu, 25 May 2006 10:25:41 -0400
-----BEGIN PGP SIGNED MESSAGE-----
Hash: SHA1

Anyone know if there is work in progress to have phase 2 of the disk staging
follow different volume pools if so desired?  As it stands in 6.0MP2, all phase
2 destinations to tape go to the same volume pool.  I have many policies 
utilizing
a storage unit group made of several dssus and it would be nice to split out the
volume pools.  The only way around this right now I know of is to have various 
dssus used for
different policies and those phase 2 schedules use whatever desired volume pool.
This would increase the number of needed dssus a little to far I think.

Thanks
Peter

- --

Peter DrakeUnderkoffler
Xinupro, LLC
617-834-2352

-----BEGIN PGP SIGNATURE-----
Version: GnuPG v1.4.1 (FreeBSD)

iD8DBQFEdb5ll+lekZRM55oRAuicAJ4rUOMsoSevRyjYvVLwEXpdWQQ1RwCgsPAX
haBZkY+2wb7gB7yG3xx5PnE=
=3JWy
-----END PGP SIGNATURE-----

<Prev in Thread] Current Thread [Next in Thread>