[Veritas-bu] dssu's and volume pool following...
2006-05-25 10:25:41
Subject: |
[Veritas-bu] dssu's and volume pool following... |
From: |
pcd at xinupro.com (Peter DrakeUnderkoffler) |
Date: |
Thu, 25 May 2006 10:25:41 -0400 |
-----BEGIN PGP SIGNED MESSAGE-----
Hash: SHA1
Anyone know if there is work in progress to have phase 2 of the disk staging
follow different volume pools if so desired? As it stands in 6.0MP2, all phase
2 destinations to tape go to the same volume pool. I have many policies
utilizing
a storage unit group made of several dssus and it would be nice to split out the
volume pools. The only way around this right now I know of is to have various
dssus used for
different policies and those phase 2 schedules use whatever desired volume pool.
This would increase the number of needed dssus a little to far I think.
Thanks
Peter
- --
Peter DrakeUnderkoffler
Xinupro, LLC
617-834-2352
-----BEGIN PGP SIGNATURE-----
Version: GnuPG v1.4.1 (FreeBSD)
iD8DBQFEdb5ll+lekZRM55oRAuicAJ4rUOMsoSevRyjYvVLwEXpdWQQ1RwCgsPAX
haBZkY+2wb7gB7yG3xx5PnE=
=3JWy
-----END PGP SIGNATURE-----
|
<Prev in Thread] |
Current Thread |
[Next in Thread>
|
- [Veritas-bu] dssu's and volume pool following...,
Peter DrakeUnderkoffler <=
|
|
|