I am running 4.5FP4. On the detailed status of the activity monitor console,
the percent complete on a backup job only gives me 0 and 100% of the backup
complete. I don't get the status in between.
Has anybody seen this? Or is there a fix for it?
Thanks
-Daniel
------_=_NextPart_001_01C35B66.54D25C50
Content-Type: text/html
Content-Transfer-Encoding: quoted-printable
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3Dus-ascii">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Activity monitor</TITLE>
</HEAD>
<BODY>
<P><FONT SIZE=3D2 FACE=3D"Arial">I am running 4.5FP4. On the detailed =
status of the activity monitor console, the percent complete on a =
backup job only gives me 0 and 100% of the backup complete. I don't get =
the status in between.</FONT></P>
<P><FONT SIZE=3D2 FACE=3D"Arial">Has anybody seen this? Or is there a =
fix for it?</FONT>
</P>
<P><FONT SIZE=3D2 FACE=3D"Arial">Thanks</FONT>
<BR><FONT SIZE=3D2 FACE=3D"Arial">-Daniel </FONT>
</P>
<BR>
</BODY>
</HTML>
------_=_NextPart_001_01C35B66.54D25C50--
|
<Prev in Thread] |
Current Thread |
[Next in Thread>
|
- [Veritas-bu] Activity monitor,
Teklu, Daniel <=
|
|
|