It will be four weeks from the day it actually occurred.

One thing that can be done in this scenario is to have the window open for
both Sunday and Monday.  If it fails Sunday it will then retry Monday instead
of waiting an entire week.

If you leave the frequency at 4 weeks, the backups would then be shifted to
run on Mondays (every 4 weeks), which is not what you want.  If you change the
frequency to something like 23 days, it will run on Monday when Sunday fails
and will then want to do a backup 23 days later but can't because the window
won't be open that day.  Then when Sunday comes around it will do the backup
then instead of leaving it on Mondays.


- Scott



                                                                                
                                                   
                    "Timothy J. Arnold"                                         
                                                   
                    <tim AT ngfl.gov DOT uk>                    To:     
<veritas-bu AT mailman.eng.auburn DOT edu>                               
                    Sent by:                             cc:                    
                                                   
                    veritas-bu-admin AT mailman DOT eng.        Subject:     
[Veritas-bu] Missing schedules                               
                    auburn.edu                                                  
                                                   
                                                                                
                                                   
                                                                                
                                                   
                    01/14/2002 09:13 AM                                         
                                                   
                                                                                
                                                   
                                                                                
                                                   




HI,

Can anyone tell me; I have a class which runs every four weeks on a
sunday. If the backup does not work for that particular month it is
carried over to next *week*. Will the monthly backup now happen four
weeks after the orig~ date or when the backup actually occurred.

I hope I have explained it correctly.

Timothy


_______________________________________________
Veritas-bu maillist  -  Veritas-bu AT mailman.eng.auburn DOT edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu





<Prev in Thread] Current Thread [Next in Thread>