Has anyone encountered any issues with path length being too long? I have a
few NDMP backups with this problem, first I get an error stating the length
of the path (anything over 1023 characters) immediately followed by an exit
status 6 (the backup failed to back up the requested files). Aside from
locating the problem paths and shortening them Veritas says there is no
workaround. What I am wondering is does the job end as soon as the path is
encountered or does Netbackup know to just skip this file and move on. I
have received two different answers from Veritas support.