ADSM-L

Re: Microsoft cluster server / TSM

2002-05-14 12:36:36
Subject: Re: Microsoft cluster server / TSM
From: Dave Canan <ddcanan AT ATTGLOBAL DOT NET>
Date: Tue, 14 May 2002 09:29:40 -0700
        I recently set something like this up, and would like to discuss
it with you, as I see several issues the way you're doing it. Is there a
phone #  I could call you at? You can also e-mail me at
ddcanan AT attglobal DOT net if you want with the phone number.


At 09:37 AM 5/14/2002 -0400, you wrote:
Need a little help.  I'm about to set up a TSM for Microsoft cluster
server.  It will be an active/active configuration.  I plan on doing it as
follows:


Machinge A
Physical disk H is a cluster group

Machine B
Physical disk I is a cluster group

Physical disk Q (quorum) is a cluster group

Machine A (normally owns disk H)
install local scheduler... always running
install scheduler for cluster group H (pointing to a dsm.opt file on the H
drive)... always running
install scheduler for cluster group Q (pointing to a dsm.opt file on the Q
drive)... always running
install failover scheduler pointing to the dsm.opt file on the I: drive
which will manage cluster group I: in the event of failure (this will be a
"Generic Service Resource for Failover" this
scheduler is not on auto start=yes)

Machine B (normally owns disk I:)
install local scheduler... always running
install scheduler for cluster group I (pointing to a dsm.opt file on the I
drive)... always running
install scheduler for cluster group Q (pointing to a dsm.opt file on the Q
drive)... always running
install failover scheduler pointing to the dsm.opt file on the H: drive
which will manage cluster group H:in the event of Machine A
failure.  (this will be a "Generic Service Resource for Failover"
this scheduler is not on auto start=yes)


Here are my two questions:
Should the scheduler for Q be running on both machine A and machine B?

For machine A...when I set up "Depencies" in cluster manager for the
"Generic Service Resource for Failover" and it states to "add all physical
disk resources", do I add both H and I?

I can't seem to get a straight answer on this one.

Regards, Joe

Money is not the root of all evil - full backups are.
<Prev in Thread] Current Thread [Next in Thread>