Help on running two schedules on Netware
2001-11-06 01:42:19
Hi
I need to run two scheduler on a Novell Client, one on a daily base and the
second one on a monthly base.
I created two different Nodes A (dsm.opt) and B (drm.opt) I created also
two different Policy Domain .
I created a backup scheduler for each one . I load in my client:
load dsmcad (default client A dsm.opt with managedservices schedule)
load dsmc sched -optfiles=drm.opt (for the second one B without
managedservices schedule)
Did it the right way to do it ……..
I am not sure about conflit of the NLM's. Got today an critical error when I
unload dsmcad anf load it again.
T.I.A Regards Robert Ouzen
|
<Prev in Thread] |
Current Thread |
[Next in Thread>
|
- Help on running two schedules on Netware,
Robert Ouzen <=
|
|
|