Problem with multiple sessions and event update
2015-10-04 17:29:34
Hello all,
I am running a NT TSM server 3.7.0
and Win32 Client 3.7.1.0
I ran a simple scheduled backup of the client starting at 23:00:00,
The node parameter maxnummp was set to 2, with the dsm.opt parameter
resource parameter was set to 6. The commmethod is TCP/IP
The schedule started no problem, with multiple sessions opening and closing
but:
07/14/2000 23:56:22 ANR0406I Session 289 started for node
OLDRAIDSRVRSMOUNTBH222 (WinNT) (Tcp/Ip
10.1.1.71(3867)).
07/14/2000 23:59:54 ANR0403I Session 289 ended for node
OLDRAIDSRVRSMOUNTBH222
(WinNT).
07/15/2000 00:00:01 ANR2580E Schedule RAID60_WEEKENDTEST in domain
LLOYDS_TSB
for node OLDRAIDSRVRSMOUNTBH222 failed.
07/15/2000 00:01:38 ANR0406I Session 290 started for node
As seen above the scheduled was said to have failed
The backup took about 10 hours, after which the following message came up in
the actlog:
07/15/2000 09:40:06 ANR0406I Session 530 started for node
OLDRAIDSRVRSMOUNTBH222 (WinNT) (Tcp/Ip
10.1.1.71(1168)).
07/15/2000 09:40:06 ANR2579E Schedule RAID60_WEEKENDTEST in domain
LLOYDS_TSB
for node OLDRAIDSRVRSMOUNTBH222 failed (return
code 4).
07/15/2000 09:40:06 ANR2576W An attempt was made to update an event
record for
a scheduled operation which has already been
executed -
multiple client schedulers may be active for node
OLDRAIDSRVRSMOUNTBH222.
07/15/2000 09:40:06 ANR0403I Session 530 ended for node
OLDRAIDSRVRSMOUNTBH222
(WinNT).
07/15/2000 09:40:06 ANR0406I Session 531 started for node
Does anyone have any idea what the error is and how to fix. I had the same
kind of problem when when doing a backup using TDP for
exchange,baclient-scheduler and CMD script to kick off the backup.
Regards
Dominic
|
|
|