Pre and post scheduling with Netware
1998-12-01 17:58:49
I am trying to disable logins and clear all connections on a Netware client
before performing an incremental backup using the following *.ncf:
CLEAR STATION ALL
DISABLE LOGIN
The object is to clear all user connections and keep them off during the login.
However, this prevents the client itself from logging in to the file system.
Is there any way to clear everyone out, keep them out, and still do the
incremental?
|
<Prev in Thread] |
Current Thread |
[Next in Thread>
|
- Pre and post scheduling with Netware,
Gerry Hibbs <=
|
|
|