Migration on two tape a the same time.
2015-10-04 18:01:07
Hello,
Actually I have primary tape and copy tape storage. I have
administrative jobs that backup primary on copy storage pool. I want to
migrate at the same time from the disk stgpool, to primary and copy
storage pool.
It 's possible ?
Thanks
[Matthew Warren]
Hello,
Yes it is possible. We do it here every day at BT.
The backup stgpool process takes a snapshot of what the primary tape
pool looks like, and then backs that up to the copy tape pool.
If you then start migrating from a disk pool to the primary tape pool
it will work ok, but none of the migrated data will be included in the primary
-> copy tape pool backup.
Matthew Warren.
BT Open systems storage managment.
mwarren AT osmf.bt.co DOT uk.
|
<Prev in Thread] |
Current Thread |
[Next in Thread> |
- Re: Migration on two tape a the same time., (continued)
- Re: Migration on two tape a the same time., Kelly J. Lipp
- Re: Migration on two tape a the same time., Yu Chen
- Re: Migration on two tape a the same time., David Cannon
- Re: Migration on two tape a the same time., Kelly J. Lipp
- Re: Migration on two tape a the same time., David Cannon
- Re: Migration on two tape a the same time., Lambros Rizos
- Re: Migration on two tape a the same time., Matthew Warren
- Migration on two tape a the same time., MED-Cap Gemini
- Re: Migration on two tape a the same time., David Cannon [SMTP:cannon
- Re: Migration on two tape a the same time., David Cannon [SMTP:cannon
- Migration on two tape a the same time.,
MED-Cap Gemini <=
|
|
|