So I’m messing around with SLP’s and want to
make sure the behavior I’m seeing is expected. Basically what I see
is that every SLP relocation is broken out with one client per job. With
DSSU relocation you can set the STAGING_JOB_KB_LIMIT and it will group all of
the clients into larger jobs not to exceed that size. Here’s how I
have lifecycle parameters configured:
# cat LIFECYCLE_PARAMETERS
DUPLICATION_SESSION_INTERVAL_MINUTES 10
MIN_KB_SIZE_PER_DUPLICATION_JOB 209715200
MAX_KB_SIZE_PER_DUPLICATION_JOB 2147483648
IMAGE_EXTENDED_RETRY_PERIOD_IN_HOURS 2
MAX_MINUTES_TIL_FORCE_SMALL_DUPLICATION_JOB 30
If, for example, I backed up 10 clients of 20GB each I expect that it
would group the relocation of the clients into one job with a size of 200GB for
that job but what I get is 10 20GB jobs. It gets the job done but I have
to believe there is additional overhead with running that way. Is this
expected behavior or is something wrong?