2 things.
The parent_end/start only runs on the
master server. So if you use that you will have to script it to run the
command over on the client.
The bpstart/end runs on the client but –
will run for each job on the client. – you can make it bpstart_notify.policy.schedule
.bat so it only runs for jobs in that policy and that schedule – but again it
will run for each child job. So if you use that, try to make it so it is the
only job under that policy.schedule so it does not run for anything else.
From:
veritas-bu-bounces AT mailman.eng.auburn DOT edu [mailto:veritas-bu-bounces AT mailman.eng.auburn DOT edu]
On Behalf Of Kenneth Hansen
Sent: Thursday, June 04, 2009 9:56
AM
To:
veritas-bu AT mailman.eng.auburn DOT edu
Subject: Re: [Veritas-bu] Pre /
Post Scripts on Backup Jobs with Streams- Revisit with 6.5.3
Hi,
Use the
bpstart_notify and bpend_notify scripts to do this.
On each client make
a:
bpstart_notify.bat
bpend_notify.bat
located in
C:\Program Files\Veritas\NetBackup\bin catalog
Insert your NET STOP
and NET START command in the script files ( bpstart_notify.bat should contain
the NET STOP command) on the servers you need to stop AV.
This should fix your
problem J
Regards
Kenneth
From:
veritas-bu-bounces AT mailman.eng.auburn DOT edu [mailto:veritas-bu-bounces AT mailman.eng.auburn DOT edu]
On Behalf Of WEAVER, Simon
(external)
Sent: 4. juni 2009 16:48
To:
veritas-bu AT mailman.eng.auburn DOT edu
Subject: [Veritas-bu] Pre / Post
Scripts on Backup Jobs with Streams - Revisit with 6.5.3
Hello all
I wanted to revisit this
problem, seeing as I am on 6.5.3 for clients and Master / Media / Windows 2003
SP2
Last time I had a problem
on Oracle. Good news is, I dont need to this, but I do have a problem with an
Oracle, Exhange and some file level systems while the AV is running and the
Backups runs.
I have a Policy with 10
clients, All Win2k3. This Policy allows for Multiple Data Streams.
What I need to do is
during the backup, I need to shutdown the Relevant AV services, and restart
ONLY when the entire job has completed on the clients.
I recall a script in
6.5.3 called Parent_start and Parent end. I just wondered if anyone uses this,
or could tell me if this would help me get around the problem.
Essentially, I only need
to use the Windows command NET STOP <ServiceName> and when the backup
completes (regardless of status) NET START <ServiceName>
With 5.1, it was
problematic, as a client could have 5 volumes, and although I can stop the
Service just fine, if one partition ended quickly, the Service would start up!
This is due to the streaming as I read it.
Any advice is very
welcome, Thanks again
Simon
This email (including any attachments) may contain confidential and/or privileged information or information otherwise protected from disclosure. If you are not the intended recipient, please notify the sender immediately, do not copy this message or any attachments and do not use it for any purpose or disclose its content to any person, but delete this message and any attachments from your system. Astrium disclaims any and all liability if this email transmission was virus corrupted, altered or falsified. -o- Astrium Limited, Registered in England and Wales No. 2449259 Registered Office: Gunnels Wood Road, Stevenage, Hertfordshire, SG1 2AS, England |
No virus found in this incoming message.
Checked by AVG - www.avg.com
Version: 8.5.339 / Virus Database: 270.12.52/2152 - Release Date: 06/03/09
05:53:00