Veritas-bu

[Veritas-bu] Multiple jobs running

2007-06-21 09:24:08
Subject: [Veritas-bu] Multiple jobs running
From: "Wooten, FH Frank @ IS" <frank.h.wooten AT l-3com DOT com>
To: <veritas-bu AT mailman.eng.auburn DOT edu>
Date: Thu, 21 Jun 2007 07:56:01 -0500
We have just upgraded to 6.0 mp4. One thing I have noticed is that I'm seeing a policy run multiple times through out the schedule. I have one policy that backs up 2 drives and it backed up the same to drives 10 times successfully. Just wondering if this is a bug with the new software or something new with scheduling.
 
Thanks
Frank
 
Frank Wooten
E-mail Server Group
L-3 Integrated Systems
903-457-3934

 

_______________________________________________
Veritas-bu maillist  -  Veritas-bu AT mailman.eng.auburn DOT edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu
<Prev in Thread] Current Thread [Next in Thread>