Veritas-bu

[Veritas-bu] Getting Back On Schedule - Scheduled jobs not running on time...

2004-07-07 08:49:33
Subject: [Veritas-bu] Getting Back On Schedule - Scheduled jobs not running on time...
From: smcallister AT orhs DOT org (McAllister, Steve P.)
Date: Wed, 7 Jul 2004 08:49:33 -0400
Sorry, Forgot to mention that I am using Calendar based scheuling...


Steve McAllister
Network/Systems Administrator
Orlando Regional Healthcare
2051 Mercy Dr.
Orlando, FL 32808
(321)841-9562 - Work
(407)983-9296 - Pager
(407)721-7156 - Cell
SMcAllister AT ORHS DOT ORG - eMail
4079839296 AT MyAirMail DOT Com - Pager



-----Original Message-----
From: Stump, Robert (Contractor) (DRMS) [mailto:Robert.Stump AT dla DOT mil] 
Sent: Tuesday, July 06, 2004 2:17 PM
To: McAllister, Steve P.; veritas-bu AT mailman.eng.auburn DOT edu
Subject: RE: [Veritas-bu] Getting Back On Schedule - Scheduled jobs not
running on time...

Set the frequency to 1 hour greater than the window.
Example...for a policy with a 10 hour window set the frequency to 11
hours. 

-----Original Message-----
From: veritas-bu-admin AT mailman.eng.auburn DOT edu
[mailto:veritas-bu-admin AT mailman.eng.auburn DOT edu] On Behalf Of
McAllister,
Steve P.
Sent: Tuesday, July 06, 2004 1:45 PM
To: veritas-bu AT mailman.eng.auburn DOT edu
Subject: [Veritas-bu] Getting Back On Schedule - Scheduled jobs not
running
on time...

All,
        I have the following config.

NB 5.0 MP1 (Enterprise)
Win 2K3 = Master Server (SSO)
Win 2000 = Media Servers (SSO)
SSO = ATL P7000 7 SDLT Drives
Windows NT 4.0, Windows 2000 & Windows 2003 server clients = 48 Policy 1
=
Scheduled 4:00pm (10hr. window) - 12 Clients (Small & Medium Sized 18gb
-
146gb) Policy 2 = Scheduled 7:00pm (10hr. window) - 12 Clients (Small &
Medium Sized 18gb - 146gb) Policy 3 = Scheduled 9:00pm (10hr. window) -
10
Clients (Small & Medium Sized 18gb - 146gb) Policy 4 = Scheduled 11:00pm
(10hr. window) - 6 Clients (Large Sized 146gb - 380gb +)<-- Media
servers
backing up self Policy 5 = Scheduled 12:00am (10hr. window) - 8 Clients
(Large Sized 146gb - 380gb +)<-- Media servers backing up self

Had errors that prevented the completion of scheduled policy backups on
multiple occasions. Now all scheduled jobs do not start at scheduled
times,
they all start @ 12:00am. I assume this is because they already ran
earlier
in the day (AM)...

My question is: Is there a way to trick NB 5.0 into thinking the jobs
have
not run, so I can get the jobs back on schedule??? During full backups I
get
a lot of network errors and job failures, during incrementals I have
successful completions. This appears to be related to saturated 100mb
full
duplex switched network connection (i.e. 48 Clients/Media Servers all
trying
to communicate with Master Server)



Steve McAllister
Network/Systems Administrator
Orlando Regional Healthcare
---smcallister@orhs_org---Change _ to .


_______________________________________________
Veritas-bu maillist  -  Veritas-bu AT mailman.eng.auburn DOT edu
http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu




<Prev in Thread] Current Thread [Next in Thread>