[Veritas-bu] 5.1 Feature or Rumor? - Backup Fails; then conti nues from POF
2004-06-29 14:47:03
Subject: |
[Veritas-bu] 5.1 Feature or Rumor? - Backup Fails; then conti nues from POF |
From: |
Robert.Stump AT dla DOT mil (Stump, Robert (Contractor) (DRMS)) |
Date: |
Tue, 29 Jun 2004 14:47:03 -0400 |
This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.
------_=_NextPart_001_01C45E09.77F82790
Content-Type: text/plain
yes but you must use TIR for this feature to work
_____
From: veritas-bu-admin AT mailman.eng.auburn DOT edu
[mailto:veritas-bu-admin AT mailman.eng.auburn DOT edu] On Behalf Of Scott
Jacobson
Sent: Tuesday, June 29, 2004 1:41 PM
To: veritas-bu AT mailman.eng.auburn DOT edu
Subject: [Veritas-bu] 5.1 Feature or Rumor? - Backup Fails; then continues
from POF
Can anyone confirm....
Have I read that with 5.1 if a backup fails, you can now resubmit the job
and if Enterprise sees a failure of that host within the same backup window
that it will now continue the backup from the POF (point of failure) and
finish the job?
Would be very handy when backing up a 2 terabyte system that fails 3/4 of
the way into the job.
Thanks,
Scott
------_=_NextPart_001_01C45E09.77F82790
Content-Type: text/html
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META HTTP-EQUIV="Content-Type" CONTENT="text/html; charset=us-ascii">
<META content="MSHTML 6.00.2800.1400" name=GENERATOR></HEAD>
<BODY style="MARGIN: 4px 4px 1px; FONT: 10pt Tahoma">
<DIV dir=ltr align=left><SPAN class=328454618-29062004>yes but you must use TIR
for this feature to work</SPAN></DIV><BR>
<DIV class=OutlookMessageHeader lang=en-us dir=ltr align=left>
<HR tabIndex=-1>
<B>From:</B> veritas-bu-admin AT mailman.eng.auburn DOT edu
[mailto:veritas-bu-admin AT mailman.eng.auburn DOT edu] <B>On Behalf Of
</B>Scott
Jacobson<BR><B>Sent:</B> Tuesday, June 29, 2004 1:41 PM<BR><B>To:</B>
veritas-bu AT mailman.eng.auburn DOT edu<BR><B>Subject:</B> [Veritas-bu] 5.1
Feature or
Rumor? - Backup Fails; then continues from POF<BR><BR></DIV>
<DIV></DIV>
<DIV>Can anyone confirm....</DIV>
<DIV> </DIV>
<DIV>Have I read that with 5.1 if a backup fails, you can now resubmit the job
and if Enterprise sees a failure of that host within the same backup
window
that it will now continue the backup from the POF (point of failure) and finish
the job?</DIV>
<DIV> </DIV>
<DIV>Would be very handy when backing up a 2 terabyte system that fails 3/4 of
the way into the job.</DIV>
<DIV> </DIV>
<DIV>Thanks,</DIV>
<DIV>Scott</DIV></BODY></HTML>
------_=_NextPart_001_01C45E09.77F82790--
|
<Prev in Thread] |
Current Thread |
[Next in Thread> |
- [Veritas-bu] 5.1 Feature or Rumor? - Backup Fails; then conti nues from POF,
Stump, Robert (Contractor) (DRMS) <=
|
|
|