This may be a bit of weird request. I have set a project up with =
Netbackup 4.5MP6 and had various problems with the tape drive etc, so =
some backups worked and some didn't. Now the drive has been replaced and =
all is working well.
The project manager in his infinite wisdom has decided that now things =
are working we need to start from day 0 and get all the backups to start =
the schedules ie monthly, weekly so they all happen on the same weekend. =
Is it possible therefore to reset somehow the schedules or databases so =
next weekend things will start from day 0 ?
Thanks
Dave
------=_NextPart_000_0224_01C3F56D.446F4890
Content-Type: text/html;
charset="iso-8859-1"
Content-Transfer-Encoding: quoted-printable
<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 4.0 Transitional//EN">
<HTML><HEAD>
<META http-equiv=3DContent-Type content=3D"text/html; =
charset=3Diso-8859-1">
<META content=3D"MSHTML 6.00.2800.1400" name=3DGENERATOR>
<STYLE></STYLE>
</HEAD>
<BODY bgColor=3D#ffffff>
<DIV><FONT face=3DArial size=3D2>This may be a bit of weird request. I =
have set a=20
project up with Netbackup 4.5MP6 and had various problems with the tape =
drive=20
etc, so some backups worked and some didn't. Now the drive has been =
replaced and=20
all is working well.</FONT></DIV>
<DIV><FONT face=3DArial size=3D2></FONT> </DIV>
<DIV><FONT face=3DArial size=3D2>The project manager in his infinite =
wisdom has=20
decided that now things are working we need to start from day 0 and get =
all the=20
backups to start the schedules ie monthly, weekly so they all happen on =
the same=20
weekend. </FONT></DIV>
<DIV><FONT face=3DArial size=3D2></FONT> </DIV>
<DIV><FONT face=3DArial size=3D2>Is it possible therefore to reset =
somehow the=20
schedules or databases so next weekend things will start from day 0=20
?</FONT></DIV>
<DIV><FONT face=3DArial size=3D2></FONT> </DIV>
<DIV><FONT face=3DArial size=3D2></FONT> </DIV>
<DIV><FONT face=3DArial size=3D2>Thanks</FONT></DIV>
<DIV><FONT face=3DArial size=3D2>Dave</FONT></DIV></BODY></HTML>