Veritas-bu

[Veritas-bu] Scheduling?

2004-01-31 00:46:20
Subject: [Veritas-bu] Scheduling?
From: David Rock <dave-bu AT graniteweb DOT com> (David Rock)
Date: Fri, 30 Jan 2004 23:46:20 -0600
--OXfL5xGRrasGEqWY
Content-Type: text/plain; charset=us-ascii
Content-Disposition: inline
Content-Transfer-Encoding: quoted-printable

* Stump, Robert (Contractor) (DRMS) <Robert.Stump AT dla DOT mil> [2004-01-30 
16:1=
6]:
> Or
> In the same class (policy) have two FULL backup schedules with the window=
 of
> opportunity set to exactly the same timeframe.=20
> The only difference is retention and frequency. If both schedules have met
> the frequency requirement then,=20
> only the one with the longest retention will be scheduled to run.
> This works for me.

It should also be noted that in this situation, if the window is large
enough, the schedule with the shorter retention may run if the first job
finishes while the window is still open.

Window for both schedules is 22:00 to 04:00
Monthly job completes at 01:00
Weekly job will run within a few minutes after 01:00 because it still
has an open window.

--=20
David Rock
david at graniteweb dot com

--OXfL5xGRrasGEqWY
Content-Type: application/pgp-signature
Content-Disposition: inline

-----BEGIN PGP SIGNATURE-----
Version: GnuPG v1.2.3 (GNU/Linux)

iD8DBQFAG0EsMrO4/Yb/xwYRAvbXAJ9qpq6AcsrQGCj1RNt55q345yc3mwCg4lm3
ndgw9xxLC44bB3LW4l+p4Bc=
=1uk7
-----END PGP SIGNATURE-----

--OXfL5xGRrasGEqWY--

<Prev in Thread] Current Thread [Next in Thread>