Veritas-bu

[Veritas-bu] Activity monitor

2003-08-08 15:23:07
Subject: [Veritas-bu] Activity monitor
From: veritas AT amlaw DOT com (Veritas)
Date: Fri, 08 Aug 2003 15:23:07 -0400
--------------050908080505000801040102
Content-Type: text/plain; charset=us-ascii; format=flowed
Content-Transfer-Encoding: 7bit

To fix this:

Install the latest NetBackup patch which is available at the
following website:
<ftp://ftp.support.veritas.com/pub/support/products/NetBackup_DataCenter/>

Download the following:
NB_CLT_45_5_M_260536.tar (Applied on the UNIX Master server and pushed out
to the clients)
NB_JAV_45_5_M_260560.tar (Applied on the UNIX Master server and pushed out
to the clients)
NB_45_5_M_260528.solaris.tar (Applied on the Solaris Master server)

Check out the readme for applying the patch.  Good luck!





Teklu, Daniel wrote:

> I am running 4.5FP4. On the detailed status of the activity monitor 
> console, the percent complete on a backup job only gives me 0 and 100% 
> of the backup complete. I don't get the status in between.
>
> Has anybody seen this? Or is there a fix for it?
>
> Thanks
> -Daniel
>
>


--------------050908080505000801040102
Content-Type: text/html; charset=us-ascii
Content-Transfer-Encoding: 7bit

<html>
<head>
</head>
<body>
<pre wrap="">To fix this:<br><br>Install the latest NetBackup patch which is 
available at the
following website:
<a class="moz-txt-link-rfc2396E" 
href="ftp://ftp.support.veritas.com/pub/support/products/NetBackup_DataCenter/";>&lt;ftp://ftp.support.veritas.com/pub/support/products/NetBackup_DataCenter/&gt;</a>
<br>Download the following:
NB_CLT_45_5_M_260536.tar (Applied on the UNIX Master server and pushed out
to the clients)
NB_JAV_45_5_M_260560.tar (Applied on the UNIX Master server and pushed out
to the clients)
NB_45_5_M_260528.solaris.tar (Applied on the Solaris Master server)</pre>
Check out the readme for applying the patch. &nbsp;Good luck!<br>
<br>
<br>
<br>
<br>
<br>
Teklu, Daniel wrote:<br>
<blockquote type="cite" 
cite="mid:7DE01C7F78C4D711BB690090273F115E078144@CS-MAIL">
  <meta name="Generator" content="MS Exchange Server version 5.5.2653.12">
  <title>Activity monitor</title>
  <p><font size="2" face="Arial">I am running 4.5FP4. On the detailed status
of the activity monitor console, the percent complete on a backup job only
gives me 0 and 100% of the backup complete. I don't get the status in 
between.</font></p>
  <p><font size="2" face="Arial">Has anybody seen this? Or is there a fix
for it?</font></p>
  <p><font size="2" face="Arial">Thanks</font><br>
  <font size="2" face="Arial">-Daniel </font></p>
  <br>
  </blockquote>
  <br>
  </body>
  </html>

--------------050908080505000801040102--


<Prev in Thread] Current Thread [Next in Thread>