Veritas-bu

[Veritas-bu] Activity monitor

2003-08-05 11:29:16
Subject: [Veritas-bu] Activity monitor
From: daniel.teklu AT thomson DOT com (Teklu, Daniel)
Date: Tue, 5 Aug 2003 11:29:16 -0400
------_=_NextPart_001_01C35B66.54D25C50
Content-Type: text/plain

I am running 4.5FP4. On the detailed status of the activity monitor console,
the percent complete on a backup job only gives me 0 and 100% of the backup
complete. I don't get the status in between.

Has anybody seen this? Or is there a fix for it?

Thanks
-Daniel 



------_=_NextPart_001_01C35B66.54D25C50
Content-Type: text/html
Content-Transfer-Encoding: quoted-printable

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3Dus-ascii">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2653.12">
<TITLE>Activity monitor</TITLE>
</HEAD>
<BODY>

<P><FONT SIZE=3D2 FACE=3D"Arial">I am running 4.5FP4. On the detailed =
status of the activity monitor console, the percent complete on a =
backup job only gives me 0 and 100% of the backup complete. I don't get =
the status in between.</FONT></P>

<P><FONT SIZE=3D2 FACE=3D"Arial">Has anybody seen this? Or is there a =
fix for it?</FONT>
</P>

<P><FONT SIZE=3D2 FACE=3D"Arial">Thanks</FONT>
<BR><FONT SIZE=3D2 FACE=3D"Arial">-Daniel </FONT>
</P>
<BR>

</BODY>
</HTML>
------_=_NextPart_001_01C35B66.54D25C50--

<Prev in Thread] Current Thread [Next in Thread>