Veritas-bu

[Veritas-bu] VSR 2.11 for W2K running partially

2003-04-10 01:32:22
Subject: [Veritas-bu] VSR 2.11 for W2K running partially
From: robert AT softsource.com DOT sg (Robert Loh)
Date: Thu, 10 Apr 2003 13:32:22 +0800
This message is in MIME format. Since your mail reader does not understand
this format, some or all of this message may not be legible.

------_=_NextPart_001_01C2FF22.93617E6A
Content-Type: text/plain;
        charset="iso-8859-1"


Anybody in this list encounter same kind of issue, please share :)
************************************************************************ 
We encounter the same problem on W2K SP2 machine to replicate about 70GB of
data with VSR 2.11 What I realized was when they are a lot of files
deletion,creation, modification on the source machine, we run into this
problem of "running Partially", Once we stop reduce the file io activities,
the replication jobs back to normal. Believe may be VSR couldn't handle
drastic changing on source machine. Any need find out more from Veritas.
Cheers... Robert 

"The Gainesville Gym Team" "<gvillegym AT gvillegym DOT com>
<mailto:<gvillegym AT gvillegym DOT com> wrote: >trying to duplicate nt server 
4.0
to nt server 4.0 total of about 3.5 gb >gets about half done & reverts to
not running in detail status but job >status say running partially. whats
the solution here. > > >jlbabb > >-- >The Gainesville Gym Team >"sports
nutrition for less" >serving the Gainesville area for over 22 years >201 nw
6th street >Gainesville Fl 32601 > 


------_=_NextPart_001_01C2FF22.93617E6A
Content-Type: text/html;
        charset="iso-8859-1"
Content-Transfer-Encoding: quoted-printable

<!DOCTYPE HTML PUBLIC "-//W3C//DTD HTML 3.2//EN">
<HTML>
<HEAD>
<META HTTP-EQUIV=3D"Content-Type" CONTENT=3D"text/html; =
charset=3Diso-8859-1">
<META NAME=3D"Generator" CONTENT=3D"MS Exchange Server version =
5.5.2650.12">
<TITLE>VSR 2.11 for W2K running partially</TITLE>
</HEAD>
<BODY>
<BR>

<P><FONT SIZE=3D2>Anybody in this list encounter same kind of issue, =
please share :)</FONT>
<BR><FONT =
SIZE=3D2>***************************************************************=
********* </FONT>
<BR><FONT SIZE=3D2>We encounter the same problem on W2K SP2 machine to =
replicate about 70GB of data with VSR 2.11 What I realized was when =
they are a lot of files deletion,creation, modification on the source =
machine, we run into this problem of &quot;running Partially&quot;, =
Once we stop reduce the file io activities, the replication jobs back =
to normal. Believe may be VSR couldn't handle drastic changing on =
source machine. Any need find out more from Veritas. Cheers... Robert =
</FONT></P>

<P><FONT SIZE=3D2>&quot;The Gainesville Gym Team&quot; =
&quot;&lt;gvillegym AT gvillegym DOT com&gt; =
&lt;mailto:&lt;gvillegym AT gvillegym DOT com&gt; wrote: &gt;trying to =
duplicate nt server 4.0 to nt server 4.0 total of about 3.5 gb &gt;gets =
about half done &amp; reverts to not running in detail status but job =
&gt;status say running partially. whats the solution here. &gt; &gt; =
&gt;jlbabb &gt; &gt;-- &gt;The Gainesville Gym Team &gt;&quot;sports =
nutrition for less&quot; &gt;serving the Gainesville area for over 22 =
years &gt;201 nw 6th street &gt;Gainesville Fl 32601 &gt; </FONT></P>

</BODY>
</HTML>
------_=_NextPart_001_01C2FF22.93617E6A--

<Prev in Thread] Current Thread [Next in Thread>