Is this a Windows environment?

If so, I remember one other circumstance which caused this; actually two.

When NAV was actively scanning filesystems on this particular server, we 
would see those errors during FULL backups. Once I rescheduled full 
backups to a day/time when NAV wasn't running, the problem went away. In 
my case, we were backing up ~600G, and NAV would typically take a couple 
of day to finish.

The second probably doesn't apply, but I'll put it out there. There was 
another Windows box (Compaq) which had NIC teaming configured. Pretty 
frequently, the job would die with 41 errors. Once we disabled NIC 
teaming, the problem went away. Veritas confirmed that they didn't play 
nice with Compaq NIC teaming, specifically, but other NIC drivers were fine.

--Steve



Tommy Wu wrote:

>Both Nortel Switch and Ethernet card is set to Full Duplex. The problem
>report shows the network connection timeout (Veritas Error 41)
>TWU
>
>-----Original Message-----
>From: Quarantine [mailto:Quarantine AT GSCCCA DOT ORG] 
>Sent: Tuesday, February 18, 2003 4:37 PM
>To: 'Steven L. Sesar'; Tommy Wu
>Cc: veritas-bu AT mailman.eng.auburn DOT edu
>Subject: RE: [Veritas-bu] Gigabit NIC & Win2K SP3 Network Shutdown
>
>What do the all log entries and problems with backups reports show?
>
>Matt
>
>-----Original Message-----
>From: Steven L. Sesar [mailto:ssesar AT mitre DOT org] 
>Sent: Tuesday, February 18, 2003 4:28 PM
>To: Tommy Wu
>Cc: veritas-bu AT mailman.eng.auburn DOT edu
>Subject: Re: [Veritas-bu] Gigabit NIC & Win2K SP3 Network Shutdown
>
>
>Are you sure that your network connections are "shutting down"? What 
>gives you that impression?
>
>Some hints where NBU and network connectivity are concerned:
>
>- make sure that both server NIC and switch port are hard set to 1000FDX
>- increase client connection timeout to something like 4500
>- increase client read timeout to something like 4500
>- increase bpstart timout to something like 2500
>- have you tweaked network buffers?
>
>Other than that, it sounds like your running NBU under Windows, which my
>
>knowledge of is extremely limited. Maybe some others on the list can add
>
>some suggestions.
>
>HTH,
>
>Steve
>
>Tommy Wu wrote:
>
>  
>
>>We are experiencing some unusual network connection problem between the
>>NBU master server and NBU media servers. Once the backup jobs kick off,
>>all the NetBackup server's network connections shutdown. Does anyone
>>know any fix?
>>DELL Power Edge 4600 with dual Gigabits NIC (Broadcom NIC).
>>Thanks
>>TWu
>>
>>_______________________________________________
>>Veritas-bu maillist  -  Veritas-bu AT mailman.eng.auburn DOT edu
>>http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu
>> 
>>
>>    
>>
>
>
>
>
>_______________________________________________
>Veritas-bu maillist  -  Veritas-bu AT mailman.eng.auburn DOT edu
>http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu
>
>  
>



--------------030805050409030906070504
Content-Type: text/html; charset=us-ascii
Content-Transfer-Encoding: 7bit

<!DOCTYPE html PUBLIC "-//W3C//DTD HTML 4.01 Transitional//EN">
<html>
<head>
  <title></title>
</head>
<body>
Is this a Windows environment?<br>
<br>
If so, I remember one other circumstance which caused this; actually two.<br>
<br>
When NAV was actively scanning filesystems on this particular server, we
would see those errors during FULL backups. Once I rescheduled full backups
to a day/time when NAV wasn't running, the problem went away. In my case,
we were backing up ~600G, and NAV would typically take a couple of day to
finish.<br>
<br>
The second probably doesn't apply, but I'll put it out there. There was another
Windows box (Compaq) which had NIC teaming configured. Pretty frequently,
the job would die with 41 errors. Once we disabled NIC teaming, the problem
went away. Veritas confirmed that they didn't play nice with Compaq NIC teaming,
specifically, but other NIC drivers were fine.<br>
<br>
--Steve<br>
<br>
<br>
<br>
Tommy Wu wrote:<br>
<blockquote type="cite" cite="mid000401c2d797$35691d70$4a09a8c0@ZWU">
  <pre wrap="">Both Nortel Switch and Ethernet card is set to Full Duplex. The 
problem
report shows the network connection timeout (Veritas Error 41)
TWU

-----Original Message-----
From: Quarantine [<a class="moz-txt-link-freetext" href="mailto:Quarantine AT 
GSCCCA DOT ORG">mailto:Quarantine AT GSCCCA DOT ORG</a>] 
Sent: Tuesday, February 18, 2003 4:37 PM
To: 'Steven L. Sesar'; Tommy Wu
Cc: <a class="moz-txt-link-abbreviated" href="mailto:veritas-bu AT 
mailman.eng.auburn DOT edu">veritas-bu AT mailman.eng.auburn DOT edu</a>
Subject: RE: [Veritas-bu] Gigabit NIC &amp; Win2K SP3 Network Shutdown

What do the all log entries and problems with backups reports show?

Matt

-----Original Message-----
From: Steven L. Sesar [<a class="moz-txt-link-freetext" href="mailto:ssesar AT 
mitre DOT org">mailto:ssesar AT mitre DOT org</a>] 
Sent: Tuesday, February 18, 2003 4:28 PM
To: Tommy Wu
Cc: <a class="moz-txt-link-abbreviated" href="mailto:veritas-bu AT 
mailman.eng.auburn DOT edu">veritas-bu AT mailman.eng.auburn DOT edu</a>
Subject: Re: [Veritas-bu] Gigabit NIC &amp; Win2K SP3 Network Shutdown


Are you sure that your network connections are "shutting down"? What 
gives you that impression?

Some hints where NBU and network connectivity are concerned:

- make sure that both server NIC and switch port are hard set to 1000FDX
- increase client connection timeout to something like 4500
- increase client read timeout to something like 4500
- increase bpstart timout to something like 2500
- have you tweaked network buffers?

Other than that, it sounds like your running NBU under Windows, which my

knowledge of is extremely limited. Maybe some others on the list can add

some suggestions.

HTH,

Steve

Tommy Wu wrote:

  </pre>
  <blockquote type="cite">
    <pre wrap="">We are experiencing some unusual network connection problem 
between the
NBU master server and NBU media servers. Once the backup jobs kick off,
all the NetBackup server's network connections shutdown. Does anyone
know any fix?
DELL Power Edge 4600 with dual Gigabits NIC (Broadcom NIC).
Thanks
TWu

_______________________________________________
Veritas-bu maillist  -  <a class="moz-txt-link-abbreviated" 
href="mailto:Veritas-bu AT mailman.eng.auburn DOT edu">Veritas-bu AT 
mailman.eng.auburn DOT edu</a>
<a class="moz-txt-link-freetext" 
href="http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu";>http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu</a>
 

    </pre>
  </blockquote>
  <pre wrap=""><!---->



_______________________________________________
Veritas-bu maillist  -  <a class="moz-txt-link-abbreviated" 
href="mailto:Veritas-bu AT mailman.eng.auburn DOT edu">Veritas-bu AT 
mailman.eng.auburn DOT edu</a>
<a class="moz-txt-link-freetext" 
href="http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu";>http://mailman.eng.auburn.edu/mailman/listinfo/veritas-bu</a>

  </pre>
</blockquote>
<br>
<br>
</body>
</html>

--------------030805050409030906070504--