I'm just starting to play around with calendar based scheduling, and ran 
into a problem last night.

I have a backup which ran and completed within it's start window. 
Another job outside of the start window was attempted and subsequently 
failed. Below is a dump of the policy in question. The schedule that ran 
was DINC. TIA, Steve


Policy Name:       Mailsrv1_Mailbox10_Mon

   Policy Type:         Standard
   Active:              yes
   Effective date:      12/31/1969 19:00:00
   Client Compress:     no
   Follow NFS Mounts:   no
   Cross Mount Points:  no
   Collect TIR info:    no
   Block Incremental:   no
   Mult. Data Streams:  yes
   Frozen Image:        0
   Backup Copy:         0
   Client Encrypt:      no
   Policy Priority:     0
   Max Jobs/Policy:     999
   Disaster Recovery:   0
   Residence:           netbackup2_stu
   Volume Pool:         mailsrv1_mailbox10
   Keyword:             (none specified)

   HW/OS/Client:  Solaris       Solaris2.6    mailsrv1

   Include:  /opt/netscape/mailbox10

   Schedule:          Full_Vlt
     Type:            Full Backup
     Maximum MPX:     4
     Retention Level: 2 (5 weeks) 8 (1 year)
     Number Copies:   2
     Fail on Error:   0 0
     Residence:       netbackup2_stu netbackup2_stu
     Volume Pool:     mailsrv1_mailbox10 rob4_offsite
     Calendar sched: Enabled
       Monday, Week 1
     Daily Windows:

   Schedule:          Full
     Type:            Full Backup
     Maximum MPX:     4
     Retention Level: 2 (5 weeks)
     Number Copies:   1
     Fail on Error:   0
     Residence:       (specific storage unit not required)
     Volume Pool:     (same as policy volume pool)
     Calendar sched: Enabled
       Monday, Week 2
       Monday, Week 3
       Monday, Week 4
       Monday, Week 5
     Daily Windows:
           Monday     18:00:00  -->  Tuesday    04:00:00

Schedule:          DINC
     Type:            Differential Incremental Backup
     Maximum MPX:     4
     Retention Level: 3 (1 month)
     Number Copies:   1
     Fail on Error:   0
     Residence:       (specific storage unit not required)
     Volume Pool:     (same as policy volume pool)
     Calendar sched: Enabled
       Sunday, Week 1
       Tuesday, Week 1
       Wednesday, Week 1
       Thursday, Week 1
       Friday, Week 1
       Saturday, Week 1
       Sunday, Week 2
       Tuesday, Week 2
       Wednesday, Week 2
       Thursday, Week 2
       Friday, Week 2
       Saturday, Week 2
       Sunday, Week 3
       Tuesday, Week 3
       Wednesday, Week 3
       Thursday, Week 3
       Friday, Week 3
       Saturday, Week 3
       Sunday, Week 4
       Tuesday, Week 4
       Wednesday, Week 4
       Thursday, Week 4
       Friday, Week 4
       Saturday, Week 4
       Sunday, Week 5
       Tuesday, Week 5
       Wednesday, Week 5
       Thursday, Week 5
       Friday, Week 5
       Saturday, Week 5
     Daily Windows:
           Sunday     18:00:00  -->  Monday     04:00:00
           Tuesday    18:00:00  -->  Wednesday  04:00:00
           Wednesday  18:00:00  -->  Thursday   04:00:00
           Thursday   18:00:00  -->  Friday     04:00:00
           Friday     18:00:00  -->  Saturday   04:00:00
           Saturday   18:00:00  -->  Sunday     04:00:00

-- 
===================================

Steven L. Sesar
Ops. Sys. Programmer/Analyst, Sr.
UNIX Infrastructure R101
The MITRE Corporation
202 Burlington Road - R101
Bedford, MA 01730
tel: (781) 271-7702
fax: (781) 271-2600
email: ssesar AT mitre DOT org
mobile: (617) 893-9635

===================================



<Prev in Thread] Current Thread [Next in Thread>
  • [Veritas-bu] Calendar Based Scheduling Problem, Steven L. Sesar <=