Re: [Networker] Fw: [Networker] Parallelism of "backup clone" pool devices?
2008-05-29 11:03:56
MIchael Leone wrote:
EMC NetWorker discussion <NETWORKER AT LISTSERV.TEMPLE DOT EDU> wrote on
05/29/2008 10:21:15 AM:
The "max parallelism" set to 4 seems fishy to me. If you want 5 jobs to
run, doesn't this need to be increased to at least 5?
Don't think so .. my other 4 drive library is set to 4, and it definitely
runs 5 or more jobs at the same time.
I believe the parallelism refers to the total number of drives that can be
in use at one time, not the total number of jobs that be run acorss the
sum of all the drives.
No it's not that at all. Max parallelism on the library controls how
many tape operations may run simultaneously, such as tape
mounts/unmounts, label operations, inventory operations etc. It has no
bearing on how many save sessions may be run.
To sign off this list, send email to listserv AT listserv.temple DOT edu and type
"signoff networker" in the body of the email. Please write to networker-request
AT listserv.temple DOT edu if you have any problems with this list. You can access the
archives at http://listserv.temple.edu/archives/networker.html or
via RSS at http://listserv.temple.edu/cgi-bin/wa?RSS&L=NETWORKER
|
|
|