Hello,
Please refer to the chapter "Backup Groups and Schedules" in the admin
guide.
Group Attributes:
Schedule - This optional attribute can be used to select a Schedule resource
for the group. If this attribute is set, it overrides the schedules selected
in the Client resource's Schedule attribute for all clients in this group.
This is a hidden attribute.
Anyway, above extract of the admin guide should clarify your doubt!
Regards
Shyam
On 7/20/06, bob flynn <bob.flynn AT s3group DOT com> wrote:
Hi,
I have the following scenario.
1. Client A
Schedule Set to default, member of Group B
2. Group B
Level not set in Group B. Group B uses Schedule C.
3. Schedule C
Level set to Full ( for certain days, skip for rest )
4. Pool D
Pool D contains Group B. Level is not set in Pool D.
My understanding of the above scenario is;
Client A will run when Schedule C kicks off group B. It should run at
the Level defined in schedule C, and stream data to Pool D, as pool D is
not restricted to specific levels.
What I am seeing.
Client A runs when Schedule C kicks off group B. It runs a skip for all
dates, even though a Level Full is defined in schedule C.
Does the above make sense ?
Thanks,
-Bob
To sign off this list, send email to listserv AT listserv.temple DOT edu and type
"signoff networker" in the
body of the email. Please write to networker-request AT listserv.temple DOT edu
if you have any problems
wit this list. You can access the archives at
http://listserv.temple.edu/archives/networker.html or
via RSS at http://listserv.temple.edu/cgi-bin/wa?RSS&L=NETWORKER
|