Hi everybody.
May I do that with the JobDefs definitions?
If so, may I use 2 JobDefs directives in 1 Job directive ?
br Robert
From: Robert Kromoser
Sent: Mittwoch, 04. Mai 2011 17:39
To: 'bacula-users AT lists.sourceforge DOT net'
Subject: masterjob ???
Hi everybody.
To backup our Linux CRM systems I want to distinguish between the backup
of the code files and the database and so I have defined two jobs for each
client.
I did it because the database will be a full backup every day but the backup of the code files is a full backup once a week
and an incremental backup during weekdays.
Does exist a way to define a master job which contains these both jobs in one job run
or must I schedule both jobs individual each day per client?
If so I will define two master jobs. One with the database Backup and the full backup of the code files
and a second one with the database backup and the incremental backup for the code files.
The goal is to have one backup job a day which contains all the backup jobs of a system
in one run.
br Robert