Re: [Bacula-users] Howto limit job concurrency on individual tape drives within a library
2009-03-28 04:55:57
Paul Hanson schrieb:
> Currently we have an IBM TS3200 working very well over fibre channel and
> has two Ultrium 4 tape units. If I set concurrency to two (2) then both
> tape units can work fine. However, if only one tape unit is in operation
> and two jobs start for the SAME tape pool, then the jobs are interlaced
> and I would prefer the jobs to be ran sequentially.
>
>
>
> What options do I have for controlling concurrency to get the best from
> the two tape unit library??
feature request: "Maximum Concurrent Jobs" for drives when used with
changer
http://article.gmane.org/gmane.comp.sysutils.backup.bacula.devel/13164/
You can use different priorities.
Ralf
------------------------------------------------------------------------------
_______________________________________________
Bacula-users mailing list
Bacula-users AT lists.sourceforge DOT net
https://lists.sourceforge.net/lists/listinfo/bacula-users
|
|
|