I want to keep my cycles as short as possible so I can take
a small subset of my tapes offsite for disaster recovery. I do dumps 5 nights a
week. I was hoping to have a cycle of 3 days and 3 dumps per cycle, but with
this config it always tries to do level 0’s on everyone every Monday.
Is there a way I can tell the system to ignore weekends
completely?
JLM
Jeremy Mordkoff
Tatara Systems
978-206-0808 (direct)
978-206-0888 (fax)