Re: Scheduler problem
2004-12-15 02:34:34
Timoty,
time specified in schedule, which is one second after midnight already was
(I mean today 12/15). Next one second after midnight will be on 16th.
Right?
Regards
Ing. Jozef Zatko
Login a.s.
Dlha 2, Stupava
tel.: (421) (2) 60252618
Timothy Hughes <Timothy.Hughes AT OIT.STATE.NJ DOT US>
Sent by: "ADSM: Dist Stor Manager" <ADSM-L AT VM.MARIST DOT EDU>
12/14/2004 05:48 PM
Please respond to
"ADSM: Dist Stor Manager" <ADSM-L AT VM.MARIST DOT EDU>
To
ADSM-L AT VM.MARIST DOT EDU
cc
Subject
Scheduler problem
Hello,
I checked the DSMcad and it shows the next scheduled operation is for
12/16/04 it should say 12/15/04.
I killed the DSMCAD and restarted it, But it shows the next backup
schedule 12/16/04. These backups runs everynight. I need to get
this backup ready for 12/15/04.
Anyone every have this problem with the schedule showing
the wrong date? This is happening on the two Backup sessions that
I cancelled this morning.
AIX client 5.1.5
TSM 5.2.3.5
Thanks for any help!
$ tail dsmwebcl.log
Executing scheduled command now.
12/14/04 11:26:34 (dsmcad) Next operation scheduled:
12/14/04 11:26:34 (dsmcad)
------------------------------------------------------------
12/14/04 11:26:34 (dsmcad) Schedule Name: MIDNIGHT
12/14/04 11:26:34 (dsmcad) Action: Incremental
12/14/04 11:26:34 (dsmcad) Objects:
12/14/04 11:26:34 (dsmcad) Options:
12/14/04 11:26:34 (dsmcad) Server Window Start: 00:00:01 on 12/16/04
12/14/04 11:26:34 (dsmcad)
------------------------------------------------------------
12/14/04 11:26:34 (dsmcad) Waiting to be contacted by the server.
ForwardSourceID:NT000549D6
|
|
|