Antwort: Help on running two schedules on Netware
2001-11-06 09:39:22
Robert,
we are running two schedules on our netware servers as well.
One for daily incremental and one for monthly selective backup.
But only one NLM loaded.
The difference is in the scheduled job, not in the dsm.opt.
So, why do you need to run two scheduler. What is your goal ?
Greetings
Jan Moewe
Robert Ouzen
<rouzen AT UNIV DOT HA An: ADSM-L AT VM.MARIST
DOT EDU
IFA.AC.IL> Kopie:
Gesendet von: Thema: Help on running two
schedules on Netware
"ADSM: Dist
Stor Manager"
<ADSM-L AT VM DOT MARI
ST.EDU>
06.11.2001
07:38
Bitte antworten
an "ADSM: Dist
Stor Manager"
Hi
I need to run two scheduler on a Novell Client, one on a daily base and the
second one on a monthly base.
I created two different Nodes A (dsm.opt) and B (drm.opt) I created also
two different Policy Domain .
I created a backup scheduler for each one . I load in my client:
load dsmcad (default client A dsm.opt with managedservices schedule)
load dsmc sched -optfiles=drm.opt (for the second one B without
managedservices schedule)
Did it the right way to do it ??..
I am not sure about conflit of the NLM's. Got today an critical error when
I
unload dsmcad anf load it again.
T.I.A Regards Robert Ouzen
|
<Prev in Thread] |
Current Thread |
[Next in Thread>
|
- Antwort: Help on running two schedules on Netware,
Jan Moewe <=
|
|
|