Dear all,
I have the following problem.
MY customer want to setting up a tape library backup
pool. Their spec. 're as follows:
Tape 1 for monday, tape 2 for tue, ....., and tape 6 for
sat & sun. At each tape, they wanna keep 3 backup
(i.e.=00keep totally = 3 weeks data for 6 tape), When
being backup at the forth weeks,the want to delete the
1st weeks data.
Actually, I had thinking for the following method:
1, Configure 6 schedule, each schedule for 1 day backup,
2, Configure each tape for one volume,
3, Each schedule backup in individual volume, and
configure it for keeping 3 backup.
Is the above method possible? If yes, would you pls
show me how to configure the schedule backup in specific
volume? Actually, I only know how to configure the tape
library to 6 volume, but I don't know how to configure
the schedule to backup in special volume, would you pls
tell me where (policy domain, automate
client operations,....or....)to configure it, so that I
can configure it more faster.
Thank you.
Regards,
Andy Yeung
|