Re: NT Tape unload after scheduled backup.
1999-04-29 10:09:43
Look at the devclass settings, the mount retention parameter is the
length of time the tape will be held after use, before it is dismounted.
Mark F wrote:
>
> Hi
>
> After running a scheduled backup, the lights on my DLT drive indicate that
> the tape is in use. Is there any way I can vary the drive offline
> after a scheduled backup, so that the operator can unload the tape without
> fear of doing it during a backup.
>
> Thanks
>
> Mark Fergusson
> Technical Consultant
> Avnet Bytech Limited
|
|
|