Re: Scheduling Reclamation
1995-07-24 06:46:55
On Fri, 21 Jul 1995 15:17:56 -0400 (EDT) Chris Beagle said:
>Our site is the process of installing ADSM on a Sun Solaris system
>and in reading the Administrator's Guide on the subject of Reclamation
>of tapes there is no mention of Scheduling. Can you control, after a
>volume has reached the Reclamation Threshold, when the reclamation
>process is to begin, so to control the use of the tape drives. We
>only have two tape drives and don't want reclamation to occur during
>our backup or archive window.
You can use:
UPD STG tapepoolname RECLAIM=100
to avoid the beginning of the reclamation process and specify a lower
value when you want the reclamation process to start.
|
|
|