- 1. [Veritas-bu] Netbackup 4.5 Jobs per drive (score: 1)
- Author: SGrieve AT templeinland DOT com (Grieve, Shane (TIFPC))
- Date: Fri, 2 Aug 2002 08:51:47 -0500
- We have just upgraded to NB 4.5 and it will only run 2 jobs per drive in a Sun L20 with DLT 8000 drives. The maximum MXP per drive is set to 6 and the most it will run is 2 jobs per drive, all others
- /usr/local/webapp/mharc-adsm.org/html/Veritas-bu/2002-08/msg00025.html (10,570 bytes)
- 2. [Veritas-bu] Netbackup 4.5 Jobs per drive (score: 1)
- Author: jmcalroy AT lehman DOT com (McAlroy, Jonathan)
- Date: Fri, 2 Aug 2002 15:12:17 +0100
- MPX is set in two places.. In the Class-Schedule and in the Storage Unit.. It's probably been reset to 2 in one of them. Regards Jonathan Lehman Brothers Europe We have just upgraded to NB 4.5 and it
- /usr/local/webapp/mharc-adsm.org/html/Veritas-bu/2002-08/msg00026.html (12,123 bytes)
This search system is powered by
Namazu