Author: Gaspare Siclari <gaspare.siclari AT buongiorno DOT com>
Date: Thu, 15 Jul 2010 10:37:24 +0200
Hi All, i have a problem with a job that every night takes all tapes in "Append" status from scratch pool. After that the job has no Append tapes in Scratch pool and will wait for a Mount request. Th
Author: Gaspare Siclari <gaspare.siclari AT buongiorno DOT com>
Date: Fri, 16 Jul 2010 10:52:02 +0200
Hi All, i have a problem with a job that every night takes all tapes in "Append" status from scratch pool. After that the job has no Append tapes in Scratch pool and will wait for a Mount request. Th
Author: Robert Hartzell <bear AT rwhartzell DOT net>
Date: Fri, 16 Jul 2010 05:49:31 -0700
I had the same problem last week. In my case the job wrote to the last volume it could grab and then went back and wrote to the first. I manually moved the other volumes back to the scratch pool and