Results 1 to 3 of 3
-
12-06-2005, 12:58 PM #1Member
- Join Date
- Aug 2005
- Posts
- 70
- Thanks
- 0
- Thanked 0 Times in 0 Posts
Hi,
The schedule expiration day we define through the web interface (TSM 5.2.4.0 server), e.g. if i define December 31st, 31/12/2005. The schedule is for 22:00hrs daily, question is: Will the backup run on 31st or will it run till 30th and will NOT run on 31st? Will it expire "AFTER" 31st or "ON" 31st?
hope my question is clear.
thanks in advance.
Nasir--- life is a forever incremental history.
-
12-06-2005, 05:31 PM #2Member
- Join Date
- Jul 2005
- Location
- Czech Republic
- Posts
- 186
- Thanks
- 0
- Thanked 0 Times in 0 Posts
Hello,
If you don't specify the time, it defaults to 23:59:59. So the task scheduled for 22:00 will run on 31.12.2005.--CrazyMaD
-
12-07-2005, 09:06 AM #3Member
- Join Date
- Aug 2005
- Posts
- 70
- Thanks
- 0
- Thanked 0 Times in 0 Posts
Thanks.
--- life is a forever incremental history.
Similar Threads
-
An empty tape won't go back to scratch
By DiegoC in forum Backup / Archive DiscussionReplies: 6Last Post: 07-27-2006, 04:03 PM -
Help With : Implementing Off Site Backups
By pinsky in forum Backup / Archive DiscussionReplies: 8Last Post: 02-18-2006, 05:50 AM -
show schedules only with some Expiration date
By rogwall in forum Administrative ClientReplies: 2Last Post: 12-13-2005, 05:19 PM -
DR instruction plan files??
By fwang in forum Disaster Recovery ModuleReplies: 12Last Post: 12-07-2005, 01:10 PM -
Change existing archives expiration date
By krelvin in forum Backup / Archive DiscussionReplies: 1Last Post: 03-25-2003, 02:49 PM


Reply With Quote