Results 1 to 2 of 2
-
12-11-2012, 01:47 PM #1Newcomer
- Join Date
- Apr 2012
- Posts
- 4
- Thanks
- 0
- Thanked 0 Times in 0 Posts
INFORMIX Backup two different schedules
Hello,
I hope anyone can help me with this subject.
I search... and search, and i can't find an answer to this "issue".
I Have an INFORMIX database associated to a schedule.
The "Problem":
I want to add 2 another schedules for INFORMIX databases.
Schedule_M (Monthly Schedule)
Schedule_Y (Yearly Schedule)
I know that I have do add in dsm.sys two different node names like: Informix_M and Informix_Y.
And for complete this task for stanza names I need two have two dsm.opt with the correspondent node names.
My questions are:
What steps I have to do to make it works?
Thanks in advance for your help.
-
04-29-2013, 07:39 PM #2Member
- Join Date
- Dec 2007
- Posts
- 244
- Thanks
- 1
- Thanked 7 Times in 7 Posts
YEah, add all stanzas for each node name into your dsm.sys, create the nodes on the TSM server, setup your MGMT/copy with retention requirement. Then you need a CAD or SCHED service for each node running. You can do it with DSM_DIR etc variables to specify what dsm.opt to use and use the dsmsched, or have the dsmcad with -optfile=monthly.opt etc.
Similar Threads
-
TSM Backup for Informix 9.4.1
By ukhan20 in forum TDP/Application Layer BackupReplies: 0Last Post: 10-22-2010, 05:53 AM -
Informix 9 backup
By msosin in forum TDP/Application Layer BackupReplies: 20Last Post: 06-01-2010, 08:31 AM -
TSM Backup Informix
By jackyzhang in forum TDP/Application Layer BackupReplies: 0Last Post: 04-01-2008, 03:11 PM -
Informix backup problems...
By CBell in forum TDP/Application Layer BackupReplies: 0Last Post: 12-22-2005, 05:35 PM -
Informix backup size
By radiox in forum Backup / Archive DiscussionReplies: 0Last Post: 12-13-2005, 03:28 PM


Reply With Quote
