Results 1 to 8 of 8
  1. #1
    Member
    Join Date
    Jun 2010
    Posts
    84
    Thanks
    2
    Thanked 1 Time in 1 Post

    Default How to Multiple schedule for VM backup

    Hi All,

    i have vm backup and i create some schedule. But i have only one schedule service. But i can't run same time different schedule.

    Please share me youe experience?

    Thank you

    my vm enviroment version 6.3.0.0
    my tsm server version 6.1
    OS level AIX 5.3 TL12

  2. #2
    Member
    Join Date
    Oct 2011
    Posts
    103
    Thanks
    1
    Thanked 5 Times in 5 Posts

    Default

    Just setup multiple data mover nodes. The following article might help you:
    http://www.ibm.com/developerworks/wi...l+Environments

  3. #3
    Member
    Join Date
    Jun 2010
    Posts
    84
    Thanks
    2
    Thanked 1 Time in 1 Post

    Default

    hi drivechip,

    i just try settings multiple schedule.
    i have one proxy node . i want to change it but i can't.

    tsm: VBTSM>q proxynode target=VC1_DC1

    Target Node Agent Node
    --------------- ---------------------------------------------
    VC1_DC1 VC1_VCLI1 VC1_DC1_DM1

    tsm: VBTSM>


    i have the other nodes name : INTRA01_01, INTRA00_01

    please help me how can i do it?
    Thank you.

  4. #4
    Member
    Join Date
    Oct 2011
    Posts
    103
    Thanks
    1
    Thanked 5 Times in 5 Posts

    Default

    You just need to define the proxy/agent reletationship for DC and INFRA01/00 nodes.

    Please describe that you want to do in detail.

  5. #5
    Member
    Join Date
    Jun 2010
    Posts
    84
    Thanks
    2
    Thanked 1 Time in 1 Post

    Default

    My previous proxynode settings;

    grant proxynode target=VC1 agent=VC1_DC1,VC1_VCLI1
    grant proxynode target=VC1_DC1 agent=VC1_VCLI1,VC1_DC1_DM1


    but rigt now i don't know how to do this? ( how t change "grant proxynode target=VC1_DC1 agent=VC1_VCLI1,VC1_DC1_DM1")



    thank you.

  6. #6
    Member
    Join Date
    Oct 2011
    Posts
    103
    Thanks
    1
    Thanked 5 Times in 5 Posts

    Default

    Use revoke proxynode to revoke a releationship. Use grant proxynode to define a new releationshit. Sorry, but I do not see your point.

  7. #7
    Member
    Join Date
    Jun 2010
    Posts
    84
    Thanks
    2
    Thanked 1 Time in 1 Post

    Default

    Hi drive chip,

    yes this is my point i can't explain myself correctly. sorry about my english

    so;

    1) revoke proxynode target=VC1_DC1 agent=VC1_VCLI1,VC1_DC1_DM1
    2) grant proxynode target=VC1_DC1 agent=VC1_VCLI1,VC1_DC1_DM1,INTRA01_01, INTRA00_01

    is this correct? i added "INTRA01_01, INTRA00_01" nodes. Right?

    thank you.

  8. #8
    Member
    Join Date
    Oct 2011
    Posts
    103
    Thanks
    1
    Thanked 5 Times in 5 Posts

    Default

    As you don't want to remove any proxy releationship you can just run command 2). TSM will notify you that some agents are already granted and will add the addional agents.

Similar Threads

  1. How to run multiple threads for the same schedule service
    By Petur in forum TSM Installation, Upgrade and Configuration
    Replies: 1
    Last Post: 04-04-2011, 12:58 PM
  2. One Client schedule or multiple better
    By proehl1 in forum Performance Tuning
    Replies: 6
    Last Post: 08-12-2010, 07:31 PM
  3. Schedule to run multiple times
    By Jcage in forum Backup / Archive Discussion
    Replies: 1
    Last Post: 04-25-2008, 09:58 AM
  4. Multiple nodes associated with a single backup schedule
    By s_abrey in forum Performance Tuning
    Replies: 4
    Last Post: 10-31-2007, 01:53 PM
  5. I cant get a schedule to backup multiple sub-directories and files
    By yacc in forum Backup / Archive Discussion
    Replies: 1
    Last Post: 02-09-2006, 03:12 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •