Results 1 to 3 of 3

Thread: Parallel script

  1. #1
    Member
    Join Date
    Jan 2009
    Posts
    150
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Default Parallel script

    Hi,

    need some help on this script that I created, I want to know if I have this script correctly made for each section to finish its process before it move to the next section.


    set dbrecovery lto5_class
    PARALLEL
    backup stgpool DISKPOOL OFFLINE_POOL1 maxprocess=1 wait=yes (section1)
    SERIAL
    PARALLEL
    backup stgpool ONLINE_POOL1 OFFLLINE_POOL1 maxprocess=1 wait=yes (section2)
    backup stgpool ONLINE_POOL2 OFFLLINE_POOL2 maxprocess=1 wait=yes (section2)
    SERIAL
    PARALLEL
    backup stgpool ONLINE_POOL3 OFFLLINE_POOL3 maxprocess=1 wait=yes (section3)
    backup stgpool ONLINE_POOL4 OFFLLINE_POOL4 maxprocess=1 wait=yes (section3)
    SERIAL
    backup stgpool ARCH_POOL5 OFFLINE_POOL1 wait=yes (section4)

  2. #2
    Moderator moon-buddy's Avatar
    Join Date
    Aug 2005
    Location
    Somewhere in the US
    Posts
    5,861
    Thanks
    4
    Thanked 228 Times in 223 Posts

    Default

    Here is what I believe the script should look like:

    SERIAL
    set dbrecovery lto5_class
    backup stgpool DISKPOOL OFFLINE_POOL1 maxprocess=1 wait=yes (section1)
    PARALLEL
    backup stgpool ONLINE_POOL1 OFFLLINE_POOL1 maxprocess=1 wait=yes (section2)
    backup stgpool ONLINE_POOL2 OFFLLINE_POOL2 maxprocess=1 wait=yes (section2)
    PARALLEL
    backup stgpool ONLINE_POOL3 OFFLLINE_POOL3 maxprocess=1 wait=yes (section3)
    backup stgpool ONLINE_POOL4 OFFLLINE_POOL4 maxprocess=1 wait=yes (section3)
    SERIAL
    backup stgpool ARCH_POOL5 OFFLINE_POOL1 wait=yes (section4)
    Ed

  3. #3
    Member
    Join Date
    Jan 2009
    Posts
    150
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Default

    Quote Originally Posted by moon-buddy View Post
    Here is what I believe the script should look like:

    SERIAL
    set dbrecovery lto5_class
    backup stgpool DISKPOOL OFFLINE_POOL1 maxprocess=1 wait=yes (section1)
    PARALLEL
    backup stgpool ONLINE_POOL1 OFFLLINE_POOL1 maxprocess=1 wait=yes (section2)
    backup stgpool ONLINE_POOL2 OFFLLINE_POOL2 maxprocess=1 wait=yes (section2)
    PARALLEL
    backup stgpool ONLINE_POOL3 OFFLLINE_POOL3 maxprocess=1 wait=yes (section3)
    backup stgpool ONLINE_POOL4 OFFLLINE_POOL4 maxprocess=1 wait=yes (section3)
    SERIAL
    backup stgpool ARCH_POOL5 OFFLINE_POOL1 wait=yes (section4)
    Thank you.

Similar Threads

  1. Admin script - call scripts parallel
    By Lisatech in forum Scripting
    Replies: 11
    Last Post: 05-02-2012, 05:00 PM
  2. TSM 5.5 and 6.1 running in parallel
    By itcsge in forum TSM Server
    Replies: 3
    Last Post: 10-19-2009, 02:59 PM
  3. Using Parallel in a Maintenance Script
    By bobrains in forum Scripting
    Replies: 3
    Last Post: 08-05-2009, 03:24 AM
  4. backing up to two tapes in parallel
    By umur in forum Performance Tuning
    Replies: 14
    Last Post: 07-17-2008, 04:03 AM
  5. Informix parallel backup
    By tkostrevc in forum TDP/Application Layer Backup
    Replies: 1
    Last Post: 04-08-2004, 04:06 AM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •