Results 1 to 4 of 4
  1. #1
    Member
    Join Date
    Dec 2006
    Posts
    66
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Default Changing maintenance script run time

    We are planning to run maintenance on our tape library Saturday and the time seletced to do so is during the time our TSM 6.2 Maintenance script runs. I want to change the time the script runs from 7:00 AM to 13:00 for Saturday only. How do I change the run time of the Maintenance script for that one day?

  2. #2
    Member
    Join Date
    Jun 2004
    Location
    Kansas
    Posts
    204
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Default

    You could do one of two things as far as I know and I would opt for number 2.
    1. Set the current schedule to inactive and define a one time schedule for the time you want it to run or
    2. update the schedule start time to 13:00 and then after it has run update the time again back to its original time.

  3. #3
    Member
    Join Date
    Dec 2006
    Posts
    66
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Default

    If I set the current schedule to active=no and set an expiration date of Saturdays date will that change the active back to active or will it expire the schedule all together? (keeping the active to no).

  4. #4
    Member tmmckinn's Avatar
    Join Date
    Jun 2006
    Location
    Wichita
    Posts
    39
    Thanks
    0
    Thanked 0 Times in 0 Posts

    Default

    You'll probably have to use two schedules, one for Sun-Fri, and one for Saturday. Specify "DayofWeek" in each schedule, and apply the appropriate start time. Your Sun-Fri schedule would be updated with "day=sun,mon,tue,wed,thu,fri" with no blanks inbetween day specifications.
    Knowing is half the battle...
    Paying attention is the other half.

Similar Threads

  1. Daily Maintenance Script
    By nabildz in forum TSM Operation
    Replies: 1
    Last Post: 05-11-2010, 09:21 AM
  2. Using Parallel in a Maintenance Script
    By bobrains in forum Scripting
    Replies: 3
    Last Post: 08-05-2009, 03:24 AM
  3. Maintenance script fails
    By zoetaite44 in forum Administrative Client
    Replies: 10
    Last Post: 06-10-2009, 02:39 AM
  4. ANR8442E - Maintenance Script
    By lecurel in forum TSM Server
    Replies: 1
    Last Post: 03-27-2008, 01:54 PM
  5. Replies: 0
    Last Post: 10-25-2002, 06:00 PM

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •